PLEASE VISIT POSTER #248 AT THE DoW APPLIED INNOVATION WORKSHOP MARCH 2nd-5th IN WASHINGTON D.C. - Details here!
Ai-RS successfully designed and installed a full-scale remedial prototype system at an uncontaminated research site near Hillsborough, NC as part of an economic development grant.
The system includes:
112 linear feet of a vinyl sheet pile barrier wall installed in a trench excavated through residual soil and partially weathered rock to the bedrock surface
3 PileGates interlocked with the sheet piling
A CartridgeRx with permeable material in each PileGate
32 piezometers to monitor groundwater flow
The groundwater hydraulics of the SubflowRx will continue to be monitored for years.